Short answer Zoho ERP re-evaluate inspection is the September 2026 option that reopens a completed quality inspection. A Passed or Failed record goes back to In Progress, so you can edit and resubmit the result. Only Admins and Quality Managers can start it, they must enter a reason, and Zoho ERP then shows a Re-Evaluation banner and a Re-Evaluated tag.
An inspector fails a lot on Monday. On Tuesday, the gauge turns out to be off. The lot was fine, but the record still says Failed.
Zoho ERP’s September 2026 update gives a completed inspection a way back. Better still, the way back leaves a reason on the record.
Who this guide is for
This guide is for QC managers, plant heads and owners who run quality inspections in Zoho ERP. If your team ever needs to correct a result after validating it, it is for you. You will learn what re-evaluation does, who can start it, how it differs in Simple and Advanced mode, how it compares with cancelling, and what Zoho has not documented yet.
- It reopens a result. Re-evaluation moves a Passed or Failed inspection back to In Progress, so you can edit and resubmit the result.
- Two roles can start it. Zoho’s update names Admins and Quality Managers. They must enter a reason every time.
- It leaves a trail. The details page shows a Re-Evaluation banner with the reason, and list views show a Re-Evaluated indicator.
- The mode decides the record. In Simple mode you re-evaluate quality inspections. In Advanced mode you re-evaluate inspection worklists.
- It is not a cancel. Cancelling also needs a reason, but Zoho says a cancelled inspection cannot be retrieved.
What does it mean to re-evaluate a Zoho ERP inspection?
In Zoho ERP, a Quality Rule triggers an inspection on a Manufacturing Order, a Purchase Receive or, since September 2026, a Transfer Receive. The inspector records the failed units, and the system compares them with the Allowable Failures. As a result, the inspection ends as Passed or Failed. Our Zoho ERP quality inspection guide covers that full flow.
The Zoho ERP product updates for September 2026 add a way to reopen that result: “You can re-evaluate completed Quality Inspections and Inspection Worklists. When you re-evaluate, the Passed or Failed records move back to In Progress.” The note then adds: “You can then edit and resubmit the results.”
So the status goes backwards by one step. The Quality module operations help lists four statuses for inspections and worklists:
| Status | Zoho’s description | Where re-evaluation fits |
|---|---|---|
| Pending | “Inspections that are yet to be validated.” | Not completed yet, so there is nothing to re-evaluate |
| In Progress | “Inspections that have been initiated but not yet completed.” | Where a re-evaluated record goes back to |
| Passed | “Inspections that have passed validation.” | Can be re-evaluated |
| Failed | “Inspections that have failed validation.” | Can be re-evaluated |
In other words, re-evaluation works in both directions. A Failed result can turn into a pass after a correct re-check. Likewise, a Passed result can turn into a fail if new evidence shows more defects.
Who can re-evaluate a Zoho ERP inspection?
Zoho’s update is short and specific: “Admins and Quality Managers can start a re-evaluation. A reason is required.”
Zoho ERP ships both as predefined roles. The Roles help describes them this way:
- Admin: “Has full access to all modules and manages organisation-level settings, including modules, templates, and master data.”
- Quality Manager: “Manages the quality management system and oversees audits and compliance requirements.”
The same page also lists a Quality Engineer, who “Performs quality checks and handles non-conformances during production and receiving processes.” However, the update does not name that role for re-evaluation. So, in practice, you can keep the person who records a result apart from the person who reopens it. That split is useful, because a second person then signs off every correction.
In Simple or Advanced mode, which Zoho ERP inspection do you re-evaluate?
Zoho ERP runs quality in one of two modes. According to the Quality preferences help, Simple View gives you Quality Rules and Quality Inspections, while Advanced View adds Quality Templates and Inspection Worklists.
The update ties re-evaluation to that choice: “In Simple mode, you can re-evaluate the quality inspections whereas in Advanced mode, you can re-evaluate the inspection worklists.”
| Mode | Where the inspector enters results | What you re-evaluate |
|---|---|---|
| Simple | On the quality inspection itself | The quality inspection |
| Advanced | On inspection worklists, one per template | The inspection worklist |
This makes sense, because each mode reopens the record where the inspector actually entered the result. In Advanced mode, that means you correct the one worklist that went wrong.
How to re-evaluate a Zoho ERP inspection, step by step
The steps below follow the path in Zoho’s update note. Zoho gives this path for quality inspections only; it does not give the worklist path yet.
-
Sign in with the right role
First, use an Admin or Quality Manager login. The update names only these two roles for starting a re-evaluation.
-
Open the completed Zoho ERP inspection
Next, go to Quality > Quality Inspections and open the inspection that shows Passed or Failed.
-
Click Re-Evaluate and enter the reason
Then click Re-Evaluate at the top of the details page. Enter a reason that says what changed and what evidence supports it. The record moves back to In Progress.
-
Correct the result and resubmit
After that, edit the result, for example the Units Failed, and validate it again. Zoho ERP compares the new figure with the Allowable Failures, so the inspection ends as Passed or Failed once more.
-
Check the banner and the list tag
Finally, open the record and confirm the Re-Evaluation banner shows your reason. In the list view, the inspection now carries the Re-Evaluated indicator.
So, write the reason for the auditor, not for yourself. For example, “Gauge out of calibration; 20 samples re-measured on a calibrated gauge” tells the next reader exactly why the result changed.
Re-evaluate or cancel a Zoho ERP inspection?
The same update also adds cancelling. Both actions need a reason, so they can look alike. They do very different jobs, though. Zoho’s update says: “Canceling a quality inspection also cancels all inspection worklists associated with it. A cancelled inspection cannot be retrieved.”
| Re-evaluate | Cancel | |
|---|---|---|
| Use it when | The inspection was right to run, but the result was wrong | The inspection should not stand at all |
| Reason required | Yes | Yes |
| What happens | Passed or Failed goes back to In Progress, ready to edit | Zoho cancels the inspection and its worklists |
| Can you go back? | You resubmit a new result | “A cancelled inspection cannot be retrieved” |
| Who can do it | Admins and Quality Managers | The update does not name roles |
In short, re-evaluate fixes a result, while cancel removes an inspection. If you are not sure, re-evaluate first, because cancelling is final.
Worked example: re-evaluate a failed Zoho ERP inspection
For example, take a plant that buys a machined component, received in lots of 1,000 pieces (sample data). It runs Simple mode. Its Quality Rule on the Purchase Receive uses a fixed Sample Size of 20 pieces and Allowable Failures of 2. Our Zoho ERP sample size guide explains that setting.
| When | What happens | Status in Zoho ERP |
|---|---|---|
| Monday | The inspector measures 20 pieces, finds 5 out of tolerance, enters Units Failed 5 and validates | Failed (5 is more than 2) |
| Tuesday | A routine check finds the bore gauge out of calibration. The Quality Manager opens the inspection and clicks Re-Evaluate | In Progress |
| Tuesday | Reason entered: “Gauge out of calibration on Monday; same 20 pieces re-measured on a calibrated gauge” | In Progress, with the Re-Evaluation banner |
| Tuesday | The inspector re-measures, finds 1 out of tolerance, edits Units Failed to 1 and validates | Passed, tagged Re-Evaluated |
Units Failed before and after the re-check, against 2 Allowable Failures
Sample data
Written on the record, so anyone who opens it sees why Failed became Passed
Re-Evaluation banner
Without re-evaluation, the plant had two poor options: leave a wrong Failed on the record, or work around it outside the system. Instead, the correction now sits on the same inspection, with the reason in plain view.
The same flow also works the other way. Suppose a customer later reports defects from a lot that passed. A Quality Manager can re-evaluate that inspection, record the reason, and enter the higher failure count.
Who in your plant should be able to change a QC result, and what must they write? We set up Zoho ERP quality roles, rules and a reason format your auditors can read, and we test the re-evaluation flow on your own items before go-live.
From the implementation floor
A reason field only helps if people fill it in the same way. So, before go-live, we agree a short format with the QC head: what was wrong, what evidence you have, and who re-checked it. We also keep the Quality Manager role for one or two people. Then a re-evaluation is a decision, not a habit.
What Zoho has not documented about re-evaluate inspection yet
The update is one short section. Based on Zoho ERP’s pages as of November 4, 2026, these points are still open:
- Effect on stock and orders. Zoho says inspections “ensure that only approved items move forward into inventory or order completion.” However, it does not say what re-evaluation does once a Manufacturing Order is complete or a receive has gone into stock. Test this before you rely on it.
- The first result. For instance, the banner shows the reason. Zoho does not say whether the original Units Failed stays visible next to the new one. The Quality module does have Comments & History, which lets you “track activities of a Quality transaction”.
- Repeat re-evaluations. Also, Zoho does not say whether you can re-evaluate the same record more than once.
- Custom roles. The update names Admins and Quality Managers. It does not say whether a custom role can get the same permission.
- Help pages. The Quality Inspections and Inspection Worklists help pages do not mention Re-Evaluate yet. The update also gives the click path for inspections only, not for worklists.
- Plans. Finally, the update names no plan and no Early Access condition for this item.
None of this stops you from using re-evaluation today. Rather, it is the testing a Zoho ERP implementation partner should do with your own transactions first.
Related reading: Zoho ERP quality inspection, Zoho ERP transfer order inspection, Zoho ERP sample size, and every change in the September 2026 update.
Frequently asked questions about Zoho ERP re-evaluate inspection
Can I change a passed inspection in Zoho ERP?
Yes, since the September 2026 update. An Admin or Quality Manager can re-evaluate a completed inspection. The Passed or Failed record moves back to In Progress, and you can then edit and resubmit the result. Zoho ERP compares the new result with the Allowable Failures again, and you must enter a reason.
Who can re-evaluate a Zoho ERP inspection?
Zoho’s update says “Admins and Quality Managers can start a re-evaluation.” Zoho ERP includes both as predefined roles. The update does not name the Quality Engineer role or custom roles. So, if your inspectors need to correct a result, a Quality Manager or an Admin has to reopen it first.
Is a reason required to re-evaluate an inspection in Zoho ERP?
Yes. Zoho says “A reason is required.” The details page then shows a Re-Evaluation banner with that reason, and list views show a Re-Evaluated indicator. So anyone who opens the record later can see that the result changed and why. Write the reason so an auditor can follow it.
Can I re-evaluate inspection worklists in Advanced mode?
Yes. Zoho’s update says that in Simple mode you re-evaluate the quality inspections, whereas in Advanced mode you re-evaluate the inspection worklists. So you reopen the record where the inspector entered the result. Zoho’s update gives the click path for quality inspections only.
What is the difference between re-evaluating and cancelling?
Re-evaluating reopens a completed result so you can correct it. Cancelling ends the inspection, and Zoho says “A cancelled inspection cannot be retrieved.” Cancelling a quality inspection also cancels its inspection worklists. Both actions need a reason. Use re-evaluate when the inspection was valid but the result was wrong.
Does re-evaluation change stock that has already gone into inventory?
Zoho has not documented this yet. Its help says inspections ensure “only approved items move forward into inventory or order completion,” but the update does not say what happens after a receive or a Manufacturing Order has moved on. Test it in a sandbox or on a test item before you rely on it.
Conclusion
In short, a wrong QC result no longer has to stay wrong in Zoho ERP. Two roles can reopen it, a reason goes on the record, and the list shows which results changed. The feature is small, but it decides how honest your quality records stay.
So, one question for your next QC review: when a result turns out wrong, who in your plant fixes it today, and where does the reason go?
Correct QC results with a clear trail
Digiwah, a Zoho Authorized Partner, sets up Zoho ERP quality rules, roles and re-evaluation for your QC team, and trains them to correct results the right way.
Prefer to write? Tell us how your team corrects QC results today.
